⚖️ Conflict of Interest: PENS is operated by spotcommglobal, which is also a listed vendor on this registry. Entries relating to the operator follow identical rules and are reviewed by the independent Advisory Board. Operator staff recuse themselves from decisions concerning their own entries. Read the charter →
PENS Readiness Standard

Four published tiers of event network capability

A common vocabulary for organizers writing requirements and vendors bidding on them. Tier claims are self-declared until a readiness audit is completed.

Tier 1 — Community

Under 64 concurrent
  • Single uplink
  • Basic managed switching
  • Best-effort support
  • Documented topology

Tier 2 — Regional

64 to 256 concurrent
  • Dual uplink
  • Managed switching with VLAN segmentation
  • On-site engineer for full duration
  • Basic monitoring with logged metrics

Tier 3 — National

256+ concurrent
  • Redundant ISP with automatic failover
  • UPS-backed core switching
  • 24/7 NOC coverage
  • Public monitoring dashboard
  • Pre-event readiness audit passed

Tier 4 — International

Publisher-sanctioned
  • All Tier 3 criteria
  • LAN-first architecture
  • Sub-5ms path to match servers
  • Hot spares for all core hardware
  • Documented disaster-recovery plan
  • Publisher technical compliance sign-off
Readiness Audit

Pre-event verification

An organizer may request a readiness audit before an event. The checklist for the claimed tier is run against the delivered design, and the result — pass or fail — is published on the event page.

1. Request

The organizer or vendor requests an audit at least 14 days before the event, nominating a tier.

2. Checklist

Topology, redundancy, power, monitoring and staffing are checked against the published tier criteria.

3. Publication

The outcome is recorded on the event page. A failed audit is published with the same prominence as a pass.

Procurement Kit

Free templates for organizers

Using a common RFP and SLA template makes bids directly comparable, and makes it far harder for a disruption to be attributed to the wrong party after the fact.

📄 RFP Template

A request-for-proposal structure covering concurrency, redundancy, monitoring, escalation and evidence retention.

  • Concurrency and peak-load requirements
  • Required tier and justification
  • Uplink redundancy and failover expectations
  • Monitoring, logging and data-retention obligations
  • On-site staffing and escalation contacts
  • Post-event reporting requirements
View template →

📄 SLA Template

Service levels written so that responsibility boundaries are unambiguous before anything goes wrong.

  • Definition of scheduled play time
  • Uptime commitment and measurement method
  • MTTD and MTTR targets by severity
  • Explicit scope boundaries: venue power, ISP, publisher
  • Evidence and log handover within 72 hours
  • Root cause classification using the PENS taxonomy
View template →

Why scope boundaries matter

Most disputed attributions come from contracts that never defined where the vendor's responsibility ended. An SLA that names the venue's power arrangement and the ISP's delivery obligation separately makes post-event classification a matter of record rather than a matter of argument.